The Konkola Mine

The Konkola mine is situated in Chililabombwe, approximately 26 kilometres north of Chingola, and is the most northerly of the KCM’s Zambian Copperbelt mines.

These operations currently mine the Chililabombwe ore body by underground methods and have historically been focused on two existing shaft systems, No. 1 shaft and the No. 3 shaft. The Konkola mine commenced production in 1957. The operating units at the Konkola mine are the underground mine (No. 1 shaft, No. 3 shaft and new No. 4 shaft), along with a number of ventilation shafts as well as the pipe shaft) and the Konkola east and west concentrators. In June 2006 KCM commenced sinking the No. 4 shaft in the Chililabombwe South ore body as a part of its flagship Konkola Deep Mine Project.

Underground Mine

Three ore bodies characterise the Konkola mine. These occur within grey, slightly dolomitic siltstones four metres to 15 metres thick within a warped basin approximately 14 kms long and 3 kms wide. The dominant features of the mine are the Chililabombwe Anticline in the southeast and the Konkola Dome in the northwest.

Historically, the No. 1 and No. 3 shafts have been managed as two separate mines. Underground haulage connections between the two mines were developed mainly for cross tramming and dewatering purposes. The separate treatment of the two mines was due to their ore reserves being physically divided by the presence of barren gap in the ore body that has extended from the surface down to about 720 metres.

Dewatering Operations

The Konkola mine is one of the wettest mines in the Zambian Copperbelt, with inflow volumes of approximately 360,000 m3 of water per day. The water from all pump stations is channeled through sumps for settling and sedimentation before clean and clear water is pumped to the surface for discharge into the Kafue River.

The Konkola Deep Mining Project

KCM is undertaking key projects to extend life of mine and increase copper production. One such Project is the Konkola Deep Mining Project (KDMP) .

This project is aimed at expanding the production of copper ore at Konkola by accessing the rich ore body that lies beneath what the current operations have been mining. This involved the sinking of a new mine shaft to the depth of approximately 1,505 metres. In addition, the project involved the sinking of three new ventilation shafts, one dewatering shaft and the construction of additional infrastructure such as a new pump chamber and two crusher systems.

Mine development to ramp-up production is underway. KCM has reintroduced raise boring at No. 3 Shaft while high speed rail rehabilitation is also on going. Excavation works to build a pump chamber at 1390mL at No. 4 Shaft to increase dewatering capacity are also underway.

The KDMP also includes the 6 Mtpa concentrator at Konkola to enhance mining output, improve recovery and improve the concentrate grade of its copper.